SW100#011 FRIDAY
Southern Wind Shipyard
https://www.sws-yachts.com/brokerage/sw100rs-friday/
Description
Friday is a beautifully presented example of the Southern Wind 100 miniseries with sleek and sporty ‘Raised Saloon’ deck configuration. She was designed and built to meet two important objectives for her owner, long-range comfortable cruising with his family and competitive super yacht racing with his friends. Over the past decade, she has successfully accomplished these objectives while cruising between the Mediterranean and Caribbean and when competing in major events such as the St. Barth’s Bucket and Southern Wind Trophy.
Friday features a spacious four-guest cabin arrangement with master cabin forward and crew quarters aft. On deck, she features a large center cockpit with adjacent sun-lounging area where guests may relax and take meals in comfort and security. The aft cockpit is dedicated to sailing and navigation, providing direct access to the crew cabin, nav station and galley.
Always subject to a rigorous maintenance program, here is a summary of recent major works:
2021-2023:
Hull & Deck
· Recaulking of teak deck with grey Simpson caulking
· Areas repainted:
o Toe rail (Flag Blue)
o Transom (Flag Blue)
o Mast and Boom (Snow White)
o All superstructure white paint on deck (Snow White)
o All bilges (Grey Interprotect)
o All deck lockers (White)
· New retractable mooring capstan by Sanguinetti
· 4x new halyard winches
· New Antal winch buttons
· 2x new sprayhoods and new bimini over center cockpit
· New cockpit cushions
· New drums for mast winches
· New extendible cockpit table
· New grip on primary winches
Interior & Domestic
· Refinishing of varnished teak surfaces
· New TV lounge area with sofa forward of saloon
· All new interior upholstery, linens and mattresses
· All new light switches with additional USB outlets
· New veneer on floorboards
· Galley and crew area floorboards refinished with cork
· New Miele oven and stove top with gas and induction hobs
· New Miele washing machine and dryer
· New ice maker
· New toilet seats
· 4x Ocean Air blind replaced
Systems & Equipment
· New Williams Sportjet 365 tender
· New engine throttles
· New Frigomar Inverter series aircon chillers increase from 96,000 to 140,000 BTU
· New aircon touch displays
· New blades on bow thruster, down alarm installed
· New watermaker membranes
· New and upgraded electrical switches and sockets
· Installation of shore power cable reel (Glendenning)
· Hydraulic system: DC motors and all cylinders fully serviced, flushing of system and new oil
· New turbo charger, water separator and start batteries for main engine
· Overhaul of gear box
· Installation of ZIP Hydrotap (sparkling, chilled and boiling filtered water)
· Silver Ion water sterilizer
· New forward hot water boiler
· New shore water connection on transom
· Noise reduction boxes for grey water system in corridor
· Upgrade 220v AC electrical system from one to two bus
Electronics
· New B&G H5000 autopilot with 3x new autopilot controls
· 2x new computers with touch screens
· 2x new B&G Zeus 12”
· 2x new additional B&G 20/20 in cockpit
Mast, Rigging & Sails
· New North Sails 3Di Main, jib, staysail, A3 with top down furler
· Starboard side continuous EC six standing rigging replaced
· EC six rigging serviced, new Texten covering
· Rewiring of mast and boom
· New boom and spreader lights
· New Harken split track fitted for mainsail luff
· New lock and top-down furling system, KZ furler/swivels and future fibres cable
· New vang from Bamar
· New titanium chafe protection on boom
· All new running rigging from Maffioli, DSK 99 with Technora cover
· Spinnaker pole track removed from front of mast before repainting
· Antennas minimized on mast
2017-2021:
· Hull repainted in Flag Blue Awlgrip (2018)
· Replacement of Onan 19Kw generator (2018)
· Replacement of Onan 17.5Kw with a new Onan19Kw for better redundancy (2018)
· Full revision of hydraulic system (2017)
· Replacement of rudder bearings (2017)
· New Doyle mainsail (2017) and genoa (2016)
· Replacement of refrigeration compressors (one in 2018 and the second in 2020 with increased size for the freezers)
· New B&G H5000 Sailing Instruments (2015)
· Replacement or service of all pumps (2019-2020)
· Replacement and upgrade of nav screens on pedestals (2018)
· New service batteries (2016)
· New Aircon compressor and rebuilding of the second one (2019)
· Service Bamar hydraulic system 2019
· 10-year class survey completed in 2020